Engineering preparation

The park is being designed from scratch with a full set of utility networks, roads and facilities — turnkey for residents.

Site plan

Building structure

323 398m² total area · 32.34 ha
145 529m² building footprint · 14.55 ha
181 911m² resident plots · 18.19 ha
141 487m² roads, parking, common areas · 14.15 ha
Construction

Park facilities (99,502 m²)

🏭

Industrial

80 640 m²

Production buildings

📦

Warehouse

9 216 m²

Storage & logistics

🏢

Administrative

5 280 m²

Office space

🔧

Technical

4 366 m²

Engineering facilities

Utility networks

Fully centralised

The managing company fully provides connection and maintenance of networks — residents receive a ready-to-operate site.

Electricity

Connection to high-voltage grids, option for on-site generation for autonomous power.

🔥

Gas

Main gas pipeline with sufficient capacity for industrial facilities.

💧

Water

Drinking and process water, sewerage, local treatment facilities for industrial effluents.

🛣

Roads

Paved internal roads, parking, landscaped common areas.

📡

Connectivity

Fibre internet, telephony, digital infrastructure for R&D and offices.

♻️

Waste

Waste-treatment facilities, sorting and recycling — to eco-standards.

Construction costs

UAH 912 million total capex

Cost itemAmount, UAH
Earthworks, vertical planning27 165 432
Engineering design32 912 319
Networks (water, gas, electricity)123 421 196
New facility construction617 105 979
Roads & landscaping, infrastructure112 322 228
Total912 927 153

Estimates were prepared by comparative analysis based on similar technical conditions of other industrial parks.

Review the investment package

Detailed financial indicators, funding sources and expected returns of the project.

Investment